Solutions

Sustainable solutions to soil and riverbank erosion, river restoration and flood management

Our work covers these different areas:

We are able to combine both soft and hard engineering techniques to offer value engineered solutions in both wet and ecologically sensitive environments.

Here you can view our range of previous projects and filter them by different terms:

Solution Categories:
Products Used:
Specialist Plant Used:
Other Terms:

Stream reinstated over erosion controls

Protecting a Pipeline in Carmarthen

We installed erosion protection products like our Coir Rolls and Rock Rolls at this site where a pipeline was exposed in the river bed

Read more

Erosion Control at Laurel Farm, a Network Rail Site

Scour protection provided by Rock Mattresses at a Network Rail site where the river had undercut the river bank, endangering the embankment above.

Read more
Aerial shot of erosion management works

Salix Erosion Products Used in Flood Protection Repair Works

Salix’s erosion management products used in works to repair flood defences. Rock Rolls, Coir Rolls, native wetland plants and VMax C350 were all essential ingre…

Read more
Well established pre-planted Coir Rolls after a significant flood event

River Bank Erosion Management at Wisley Golf Course

Extreme river bank erosion rectified by regrading the river bank and using Coir Rolls and Coir Pallets, preventing erosion naturally

Read more
SuDS slow flow drainage channel

Erosion Control at SuDS project

Rock Rolls and Rock Mattresses are both easy to put into place, prevent erosion and can withstand high flows whilst allowing for the natural establishment of pl…

Read more

Naturalising a Stream at Bedlinog

Constant flooding and erosion had been causing some serious problems for Merthyr Tydfil Council who manage an old reclaimed tip site, close to the village of Be…

Read more
Tregaron July 2016

Flood Alleviation at Tregaron

The aim of the project was to protect around 100 houses and businesses that had been subjected to increased flood threats. Constant flooding was a problem with…

Read more
Rock Rolls on the River Washford

River Washford Roadwater Erosion Protection

The increasing frequency of flood events on the River Washford required the existing system to be replaced and improved.

Read more
Spider Menzi Muck Excavator moving large woody debris below Swinsty Reservoir

River Washburn Restoration

Salix were approached as river restoration experts and because of the innovative Menzi Muck Spider machine which is capable of climbing in and out of a river ca…

Read more
Spraying HydraCX at Silent Valley

Silent Valley Erosion Control

HydraCX™ was applied to 125,000m2 of poor, erosion prone soil at a large landfill site in Ebbw Vale, South Wales. HydraCX is a hydraulically applied erosion con…

Read more
Spider machine at Cwmparc

Cwmparc River Restoration

Salix worked with Natural Resources Wales at Cwmparc in the Rhondda Valley to renaturalise the water courses in order to reduce flood risk and increase biodiver…

Read more

River Dulais, Rhosmaen Llandeilo

Salix’s River Dulais project demonstrating the use of large woody debris (LWD) is now ten years old and has been is included in the manual of River Restoration…

Read more

Green Swales on Roadside

Soft engineered ‘Green Swale Grass Channel’ attenuates road run-off water, filters suspended solids, and traps hydro carbons and heavy metals, significantly imp…

Read more

Woodberry Wetlands

Desilting a large reservoir in the heart of London and creating a new wetland habitat. Dredging silts enabled us to create 13,000 square metres of new reed bed

Read more
VMax P550 turf reinforcement mat showing good vegetation growth

Erosion Control on Loch Garry Spillway

Erosion control using Tensar VMax P550 on Loch Garry spillway and embankments

Read more
Native plants, reed beds and pond at East Tullos Burn

Restoring East Tullos Burn

East Tullos Burn project transformed a waterway from a straight, hard-engineered channel, into a natural stream, functional floodplain and wetland habitat.

Read more

Naturalising Norfolk’s Chalk Rivers

Salix has helped the Norfolk Rivers Trust to improve wildlife habitats on the chalk River Babingley, Hillington Estate near Flitcham, and River Nar at Pentney,…

Read more
Rock mattress tie in detail at hydraulic jump zone with Vmax C350

Sandwich Flood Alleviation and Spillway Scheme

The £21.7 million flood defence scheme involved works on 16 individual reaches of the river and it reduced the risk of tidal flooding to 488 homes and 94 commer…

Read more

Scour Protection at Lhanbryde Spillway

Following the 2005 £2million Lhanbryde Flood Alleviation Scheme, near Elgin in Moray, in Summer 2014, Salix worked with Royal HaskoningDHV engineers to improve…

Read more
One Year Later. Note the Reed Canary Grass (Phalaris arundinacea)

Darwen Bank Stabilisation

A 120 metre reach of river had been subject to ongoing bank instability issues. A gas pipeline set in the bank was dangerously close to being exposed and bank r…

Read more

River Rhiw Bank Protection

Salix were awarded the contract and began works to carry out 300 metres of riverbank protection to protect this existing exposed high pressure gas pipe in March…

Read more

Olympic Park Wetlands

Salix were involved in making the Olympic Park a reality, when we were awarded the prestigious Tier 2 Contract in 2009 to grow all the wetland and wet wildflowe…

Read more
BioHaven Floating Islands on the Serpentine

Floating Island Benefits Wildlife

As part of a programme of wildlife habitat improvements in the Royal Parks, a large floating wetland island has been built on the Serpentine Lake in London’s Hy…

Read more

M25 Road Widening

Salix were tasked with greening up a 45 degree slope consisting of 6F2 fill. The initial design was a covering of 150mm of topsoil over an area of about 8,000m2…

Read more

Kingsbury Tamworth Rail Line

Salix applied HydraCX in September 2009 to slopes consisting of 6I/J fill material with no imported topsoil covering the surface. The project was monitored each…

Read more

Wilderness Lake

The Wilderness Lake is an important coarse fishery and recreational resource on the edge of Porthcawl in South Wales. It also functions as a flood storage area…

Read more

Gloucester Business Park

A new warehouse complex required a large balancing pond to take surface runoff water. The pond had steep sides which required some form of ground stabilisation.

Read more
Cwmbran Boating Lake

Cwmbran Boating Lake

The boating lake was a popular local attraction and fishing lake. The lake edges were in bad repair with little or no marginal vegetation. Floating islands were…

Read more
Longham Lakes

Longham Lakes

Working for Bournemouth & West Hants Water, Salix were appointed as Main Contractor to undertake 2km of bioengineering works to stabilise the shoreline of a new…

Read more
Ramsden Bellhouse Embankment

Ramsden Bellhouse

A series of potentially dangerous deep seated failures on a railway embankment required treatment to prevent further slips. The geotechnical issues of ground st…

Read more

Chipping Campden Rail

HydraCX was sprayed onto 5,500m2 of re graded rail embankments to prevent erosion and establish vegetation rapidly without importing expensive topsoil. HydraCX…

Read more

Foss Dyke Bank Stabilisation

A rise in pleasure boating on the Foss resulted in severe boat wash. Monitoring revealed that the rate of bank erosion was up to 2.5 metres in a year over a 2km…

Read more

Pewsey Rail Embankment

A rail embankment had slipped and was reinstated with soil nails providing geotechnical stability. Birse created working platforms with imported stone and then…

Read more

Afon Gwydol Embankment

Works were required to repair an eroding railway embankment adjacent to the river. This resulted in the embankment encroaching into the river, causing erosion p…

Read more
Papworth Reedbed

Papworth Reedbeds

After a competitive bid process, Salix designed and built a tertiary treatment reedbed for Anglian Water at their Papworth STW. Salix partnered with Pete Worral…

Read more

Salwarpe Reedbed

As part of a new large reedbed creation project Salix contract grew and planted out 125,000 reed plants grown from local provenance seed stock. Seed was hand co…

Read more

Twycross Zoo Wetlands

As Principle contractor, Salix constructed a 3 hectare wetland system to provide waste water treatment and habitat creation. 18 integrated ponds, wet grassland,…

Read more

Pembroke Commons

1 km of new and existing channel was enhanced using bioengineering techniques as part of a flood protection project in the centre of historic Pembroke in West W…

Read more

River Pinn Enhancement

Salix designed and constructed a stream enhancement project at a gas pipeline river crossing as ecological mitigation to a degraded reach of stream as part of a…

Read more

River Thaw Enhancement

Salix were asked by Environment Agency Wales to advise on methods to restore a 100 metre reach of the River Thaw which had been subject to physical degradation…

Read more

Conwy Flood Alleviation and Spillway Scheme

Salix supplied 9000m2 of VMax3 Shear stress turf in September 2009. Just 2 months later the area experienced the worst flooding in 25 years of recording with fl…

Read more

River Ebbw Bank Stabilisation

Salix worked with consulting geotechnical engineers to provide design and build proposals to stabilise over 800 metres of steep riverbank composed of highly ero…

Read more
Fully Established Bioengineering Solution Replacing Gabion Design

River Gwenfro

A private developer had back gardens adjacent to a river that when in flood created severe scour issues. Initial river modelling indicated flow velocities in ex…

Read more

River Pipeline Crossing

Salix were invited to submit a bioengineering solution to solve an erosion issue at a pipeline crossing in West Wales. The solution used a combination of locall…

Read more

River Roding Bank Protection

Salix advised engineers Halcrow on bioengineering methods to stabilise a regraded slope as part of an inter-tidal river enhancement project. The existing vertic…

Read more

River Roding Enhancement

The River Roding is an inter-tidal river and these works were undertaken 100m upstream of the Barking Barrier, Greater London. The works were part of an Environ…

Read more

Dan Y Lan Landfill Slip

The finished slope was 36 degrees, 40 metres in height and 60m wide. 250mm depth of topsoil was required, rather than the nominal 50-75mm, as cover for marginal…

Read more

Calverton Tip Drainage

Colliery shale and sandy soils have one thing in common; both are highly susceptible to erosion by flowing water. Both soil types were present on site.

Read more
C350

Waverley Colliery Reclamation

A large drainage channel designed to take flows of up to 3m/sec was created to take runoff water from a 741 acre site at Waverley, one of Europe’s biggest colli…

Read more
Locke Park Lake

Locke Park Lake

Locke Park Lake had become silted to the point that it could no longer be safely used for boating. Salix were employed as main contractor to de-silt the lake…

Read more
Dredging in front of Lichfield Cathedral

Beacon Park

Salix were employed by main contractor Casey to undertake the restoration work to Beacon Pool for Lichfield Council on this Heritage lottery funded project.

Read more

Kelham Island Goit

Salix were contracted by Mansell construction to dredge the contaminated Goit forming Kelham Island and working closely with ecologists ECUS to create marginal…

Read more

Water Vole Habitat Works

Salix successfully tendered for a pilot project to improve marginal vegetation along the River Wandle. The project formed part of a wider scheme to reintroduce…

Read more
A two hectare area of open water had extensive embankment erosion due to massive populations of Canada Geese

Upper Lake, Perton

A two hectare area of open water had extensive embankment erosion due to massive populations of Canada Geese which created public health & safety issues.

Read more

Grand Union Canal

The project aim was to restore a wetland area on the banks of the Grand Union Canal for the benefit of wildlife and the fishery. The scheme design ensured that…

Read more

Treboeth Cobble Channel

A new development had slope stability issues due to an adjacent cobble bed watercourse badly eroding the soils and downcutting the bed within the channel.

Read more
important water vole site

Soham Lode Re-visited

An important water vole site at Soham Lode required emergency re-lining of the perched section of the reach (approximately 600m) Following the emergency works,…

Read more
Whole Site Aerial 19.09.13 Copyright of the Environment Agency

Water Vole Habitat Mitigation

Medmerry is one of the stretches of coastline most at risk of flooding in southern England. The overall scheme involves building major new sea defences inland a…

Read more

River Tywi

Salix were awarded a design and build contract to prevent further erosion of a section of the riverbank and reinstate a scour hole threatening a high pressure g…

Read more
Completed drainage channel

Worden Park Leyland

Following works within Worden Park to remove a culverted section of Cricket Field Brook that was the cause of flooding to neighbouring residential properties, a…

Read more

Railway Lanes, Lewes

The integrity of the existing blockwork facing was deteriorating as a result of the tidal inundation and draw-down cycles together with areas of groundwater see…

Read more
River Teme Restoration

River Teme Restoration

The River Teme is a sensitive SSSI and SAC river and over 150 metres of severe bank erosion was threatening a National Grid pipeline.

Read more