Salix were awarded the contract and began works to carry out 300 metres of riverbank protection to protect this existing exposed high pressure gas pipe in March 2013.

Aerial of river Rhiw
Over 30m of High Pressure Gas Pipeline exposed by erosion
Over 200m of severe bank erosion
04 Installing a live brush mattress revetment with whole tree toe
Brush Mattress after 8 months growth and after 4 bankfull flood events
River Rhiw in 2017
2017 bed load response is protecting the pipeline
14 LDW after 12 months
Installing Large Woody Deflectors (LWD)
12a Completed Rootwad bank revetment
Rootwad bank after 4 months
Placing Rootwad revetments
Completed Revetment
Revetment greening after 3 months
 Staking branches and brash into place
Placing felled branches
08 Logging the tree limbs
Using a whole tree to create an engineered log revetment
Over 30m of High Pressure Gas Pipeline exposed by erosion
Over 200m of severe bank erosion
Installing a live brush mattress revetment with whole tree toe
Brush Mattress after 8 months growth and after 4 bankfull flood events
River Rhiw in 2017
2017 bed load response is protecting the pipeline
LWD after 12 months
Completed Rootwad bank revetment
Rootwad bank after 4 months
Low Pressure Long Reach Excavators
Completed Revetment
Revetment greening after 3 months
Staking branches and brash into place
Placing felled branches
Logging the tree limbs
Tree felled into scour hole
Using a whole tree to create an engineered log revetment

Salix were awarded the contract and began works to carry out 300 metres of riverbank protection to protect this existing exposed high pressure gas pipe in March 2013.

This was a design and build contract using large woody debris and willow revetments. The project dealt with severe riverbank erosion caused by the powerful tributary of the River Severn.

Salix coppiced 1500 live willow posts, sourced 45 whole trees and made 1000 live willow faggots from tree works in the same catchment as the works.

Date: March 2013 – May 2013

Total Value: £139,000
Tree Works: £59,000

Products Used

No items found

Details

Client: Wales and West Utilities
Location:
High Energy Rivers, Rivers & Water Courses