Rock Rolls and VMax C350 provide ecological erosion control at Yeovil Junction, protecting the railway from undercutting by the River Yoe
Rail
We have worked on rail embankments which are often steep and subject to erosion. We use products such as HydraCX to revegetate difficult
Better Banks!
The Environment Agency are responsible for the river bank stability at Railway Lane, Lewes and recognising the integrity of the existing blockwork facing was deteriorating began to look into solutions to this challenge.
Salix Model Railways
Rail works have become an increasingly large part of our workload, particulary now that we have a Specialist Contracting capability.
In helping to re-model railways across the UK we have been met with some unusual challenges both in terms of the erosion problems themselves and the attendant access and safe working method issues.