This large roadside project involved creating 28km of green engineered roadside swales on 14km of dual carriageway.
Six weeks after treatment we had significant plant growth on Type-1 aggregate. Zero soil. No imported topsoil or subsoil. Simply Type 1 fill material.
runoff
Naturalising a Stream at Bedlinog
Naturalising a Stream at Bedlinog
Constant flooding and erosion had been causing some serious problems for Merthyr Tydfil Council who manage an old reclaimed tip site, close to the village of Bedlinog in the Taff Bargoed Valley.
Conwy Spillway Success
In 2009 Team Van Oord installed 9000m2 of Salix’s VMax Shear Stress Turf as part of the Conwy Flood Alleviation Scheme, seven years and many major overtopping events on and it has stood the test well.
Green Swales on Roadside
Soft engineered ‘Green Swale Grass Channel’ attenuates road run-off water, filters suspended solids, and traps hydro carbons and heavy metals, significantly improving water quality.
Triton
VMax³ Shear Stress Turf
VMax³ P550
VMax³ C350
HydraCX
Eronet C125
Bionet C125BN
Restoring East Tullos Burn
East Tullos Burn project transformed a waterway from a straight, hard-engineered channel, into a natural stream, functional floodplain and wetland habitat.
Salix installs new green channel to reduce A11 pollution
Salix has installed a revolutionary green drainage channel along an 18km stretch of the A11 in Norfolk, between Fiveways and Thetford.
Naturalising a Stream: Bedlinog
Salix reviewed the options for improving water control and biodiversity at Nant Llwynog stream – an old reclaimed tip site close to the village of Bedlinog in the Taff Bargoed Valley.
New wetland habitats at East Tullos Burn
Salix has worked with Aberdeen City Council, cbec and Walking-the-Talk to restore the East Tullos Burn in St Fittick’s Park, Torry,
M25 Road Widening
Salix were tasked with greening up a 45 degree slope consisting of 6F2 fill. The initial design was a covering of 150mm of topsoil over an area of about 8,000m2 using a geocell product attached to the surface of the slope to contain the soil and prevent it from slipping.
Kingsbury Tamworth Rail Line
Salix applied HydraCX in September 2009 to slopes consisting of 6I/J fill material with no imported topsoil covering the surface. The project was monitored each year to see how the vegetation established.
Bionet C125BN
Bionet biodegradable erosion control blankets are designed to provide immediate erosion protection and vegetation establishment assistance, then degrade after the root and stem systems of the vegetation are mature enough to permanently stabilise the underlying soil.
HydraCX™
HydraCX is a hydraulically applied erosion control product that protects slopes against soil and seed loss from heavy rain and wind from day one of application. It is 100% natural, consisting of reclaimed cotton and straw fibres.
VMax³ Shear Stress Turf
Salix have the facilities to contract grow turf using the VMax range of Turf Reinforcement Mats (TRMs). VMax C350 or P550 is used as the reinforcement element within the turf giving unprecedented scour protection performance.
VMax³ P550
VMax³ P550 is composed of a permanent, ultra-high-strength, three-dimensional matting structure incorporated with a permanent 100% polypropylene fibre matrix.
VMax³ C350
VmaxC350 is a permanent Turf Reinforcement for reinforcing soils. The VmaxC350 incorporates a coir fibre layer to provide instant erosion protection, whilst the three-dimensional grid provides significant long-term protection.
Salix appointed Sole UK Distributor for VMax Soil Erosion Range
Salix are pleased to announce that We have been appointed as the sole distributors of the VMax® range of soil erosion control products formerly known as North American Green.
Better Banks!
The Environment Agency are responsible for the river bank stability at Railway Lane, Lewes and recognising the integrity of the existing blockwork facing was deteriorating began to look into solutions to this challenge.
Gloucester Business Park
A new warehouse complex required a large balancing pond to take surface runoff water. The pond had steep sides which required some form of ground stabilisation.
Afon Gwydol Embankment
Works were required to repair an eroding railway embankment adjacent to the river. This resulted in the embankment encroaching into the river, causing erosion problems on the opposite bank belonging to a local farmer.
Conwy Flood Alleviation and Spillway Scheme
Salix supplied 9000m2 of VMax3 Shear stress turf in September 2009. Just 2 months later the area experienced the worst flooding in 25 years of recording with floods exceeding the 1:30 year events of 2004/2005.
Calverton Tip Drainage
Colliery shale and sandy soils have one thing in common; both are highly susceptible to erosion by flowing water. Both soil types were present on site.
Waverley Colliery Reclamation
A large drainage channel designed to take flows of up to 3m/sec was created to take runoff water from a 741 acre site at Waverley, one of Europe’s biggest collieries.
Railway Lane, Lewes
The integrity of the existing blockwork facing was deteriorating as a result of the tidal inundation and draw-down cycles together with areas of groundwater seepages emanating from the slope profile.