Rock Rolls offer flexibility and the fact they arrive on site pre-filled with stone greatly reduces installation time and therefore cost, compared to in-situ filled gabions. Rock rolls and mattresses can also be installed during live flow situations, which is not possible with standard gabions.
Rock Mattress
Rock Mattresses
Rock Rolls
Sandwich Flood Alleviation and Spillway Scheme
The £21.7 million flood defence scheme involved works on 16 individual reaches of the river and it reduced the risk of tidal flooding to 488 homes and 94 commercial properties in Sandwich. Client – Jackson Civil Engineering working on behalf of the Environment Agency.
Sandwich Flood Alleviation Scheme
Balfour Beatty endorse Salix’s erosion control solutions
We are delighted to report that Balfour Beatty have included our Eronet C125 and VMax C350 erosion control solutions and our Rock Mattresses in their Innovation Sheets.
Rock’n’Roll!
Rock Rolls are a robust, flexible and permanent revetment for use around reservoirs, shorelines, lake edges,
Tough Test on The Teme
Better Banks!
The Environment Agency are responsible for the river bank stability at Railway Lane, Lewes and recognising the integrity of the existing blockwork facing was deteriorating began to look into solutions to this challenge.
Rhodri Tames The Tywi!
Pre-filled Rock Roll
Rock Rolls are a robust and permanent revetment for use around reservoirs, shorelines, lake edges, streams and river banks. They are cost-effective revetments that are suitable alternatives to rock rip rap and gabions in many scour applications.
Pre-filled Rock Mattresses
Rock Mattresses are a robust and permanent revetment for use around reservoirs, shorelines, lake edges, streams and river banks. They are cost-effective revetments that are suitable alternatives to rock rip rap and gabions…
River Tywi
Salix were awarded a design and build contract to prevent further erosion of a section of the riverbank and reinstate a scour hole threatening a high pressure gas pipeline on the River Tywi.
Railway Lane, Lewes
The integrity of the existing blockwork facing was deteriorating as a result of the tidal inundation and draw-down cycles together with areas of groundwater seepages emanating from the slope profile.
River Teme Restoration
The River Teme is a sensitive SSSI and SAC river and over 150 metres of severe bank erosion was threatening a National Grid pipeline.