Soft engineering solutions presented by Salix, such as Coir Rolls, Rock Rolls and shear stress turf, represent a major cost saving over traditional hard revetments
VMax³ P550 permanent turf reinforcement mat
Erosion Control on Loch Garry Spillway
Erosion control using Tensar VMax P550 on Loch Garry spillway and embankments
Scour Protection at Lhanbryde Spillway
Following the 2005 £2million Lhanbryde Flood Alleviation Scheme, near Elgin in Moray, in Summer 2014, Salix worked with Royal HaskoningDHV engineers to improve erosion control on the dam’s spillway.
Afon Gwydol Embankment
Works were required to repair an eroding railway embankment adjacent to the river. This resulted in the embankment encroaching into the river, causing erosion problems on the opposite bank belonging to a local farmer.
River Ebbw Bank Stabilisation
Salix worked with consulting geotechnical engineers to provide design and build proposals to stabilise over 800 metres of steep riverbank composed of highly erodible colliery shale.
River Gwenfro
A private developer had back gardens adjacent to a river that when in flood created severe scour issues. Initial river modelling indicated flow velocities in excess of 3.5m/sec.
River Teme Restoration
The River Teme is a sensitive SSSI and SAC river and over 150 metres of severe bank erosion was threatening a National Grid pipeline.