The boating lake was a popular local attraction and fishing lake. The lake edges were in bad repair with little or no marginal vegetation. Floating islands were also required to add further habitat for fish and wildfowl.
Floating Islands
Papworth Reedbeds
After a competitive bid process, Salix designed and built a tertiary treatment reedbed for Anglian Water at their Papworth STW. Salix partnered with Pete Worrall of Penny Anderson Associates and a unique design approach was developed.
Twycross Zoo Wetlands
As Principle contractor, Salix constructed a 3 hectare wetland system to provide waste water treatment and habitat creation. 18 integrated ponds, wet grassland, reedbeds and ditches were constructed for Twycross Zoo.