Tag Archives: silt

Aqualogs are available in 2 by 0.2 m
Product

Erosion Control Aqualog

Aqualogs are a durable fibre log made from waste material destined for landfill. They are effective revetments used in erosion management and they also happen to improve water quality

Read more
Floc Mat Diversion Channel lined with flocculent mat
Product

Floc Mats

Floc Mats are water treatment mats used for fine sediment control in polluted water. They have been designed for water quality management purposes on construction and river restoration sites where…

Read more
SiltMat
Product

SiltMat

SiltMats assist sediment removal by capturing silt deposits to reduce sediment disposition in river channels. SiltMats are positioned in the river bed downstream of earth or river bed disturbances.

Read more
Solution

Naturalising a Stream at Bedlinog

Constant flooding and erosion had been causing some serious problems for Merthyr Tydfil Council who manage an old reclaimed tip site, close to the village of Bedlinog in the Taff…

Read more
Spider Menzi Muck Excavator moving large woody debris below Swinsty Reservoir
Solution

River Washburn Restoration

Salix were approached as river restoration experts and because of the innovative Menzi Muck Spider machine which is capable of climbing in and out of a river causing little disturbance.

Read more
Solution

River Dulais, Rhosmaen Llandeilo

Salix’s River Dulais project demonstrating the use of large woody debris (LWD) is now ten years old and has been is included in the manual of River Restoration Techniques.

Read more
walthamstow by Steve Ayers
News

Water works at Walthamstow Wetlands

Walthamstow Wetlands by Stephen Ayers The latest stage of the transformation of Walthamstow Wetlands into the largest wetland nature reserve in London will see the creation of new reedbeds to…

Read more
Solution

Woodberry Wetlands

Desilting a large reservoir in the heart of London and creating a new wetland habitat. Dredging silts enabled us to create 13,000 square metres of new reed bed

Read more
Machine in action at Swinsty
News

The Spider on the River Washburn

Innovative spider machine helps restore wildlife habitats on the River Washburn. Yorkshire Water’s trial works to improve the quality of the river environment downstream of Swinsty reservoir is now well…

Read more
Rock rolls arrive in bundles with certified lifting straps
News

Rock Rolls – Effective Erosion Control

Rock Rolls offer flexibility and the fact they arrive on site pre-filled with stone greatly reduces installation time and therefore cost, compared to in-situ filled gabions. Rock rolls and mattresses can…

Read more
Olympic wetlands
News

Wetland Management Course – NOW FULL

We are hosting a 2 day Practical Wetland, River & Sediment Management Course at our Croxton Park Nursery, Norfolk, 7-8 July 2015 supported by frog environmental and cbec ec-engineering ltd.

Read more
Woodberry Wetlands desilting work
News

Woodberry in the Guardian

Wildlife gardening on a colossal scale, The Guardian admires our Woodberry Wetlands work. Desilting large areas of the old reservoirs to create new reedbeds.

Read more
Solution

Naturalising Norfolk’s Chalk Rivers

Salix has helped the Norfolk Rivers Trust to improve wildlife habitats on the chalk River Babingley, Hillington Estate near Flitcham, and River Nar at Pentney, near Kings Lynn.

Read more
New reedbed and wetland area being created
News

Wetland Creation for New Wildlife Reserve

We have started pump dredging/desilting at Woodberry Wetlands in East London, creating new reed beds and islands. Our desilting work uses an amphibious machine…

Read more
News

Improving wildlife habitats on the Royal chalk River Babingley

With the help of Salix, the Norfolk Rivers Trust is improving fish and other river wildlife habitats on the River Babingley near Flitcham, one of only two hundred chalk rivers…

Read more
News

Creating a new nature reserve in East London

Salix is helping the London Wildlife Trust to create a new nature reserve on the site of Thames Water’s East Reservoir in Stoke Newington.

Read more
News

Naturalising a Stream: Bedlinog

Salix reviewed the options for improving water control and biodiversity at Nant Llwynog stream – an old reclaimed tip site close to the village of Bedlinog in the Taff Bargoed…

Read more
Installing Ifield boardwalk piles
News

Lake Desilting & Environment Improved at Ifield Mill Pond

Salix is working with Crawley Borough Council and Jacksons Civil Engineering to help improve Ifield Mill Pond & Water Gardens, the area’s most important wetland and a designated Site of…

Read more
Titchwell Marshes Rock Rolls close up
News

Salix Rock Rolls Protect Titchwell Marsh

As part of a series of measures to protect the freshwater habitats at Titchwell Marsh Nature Reserve on the north Norfolk coast, Salix has supplied the Royal Society for the…

Read more
Revetments at Midhurst
News

Lake Desilting & Biodiversity Improvements at Midhurst’s South Pond

The South Downs National Park Authority has commissioned Salix to help create a wildlife haven on the South Pond, at the edge of Midhurst town centre in West Sussex. The…

Read more
CocoNet 800
Product

CocoNet 800

CocoNet is a strong hand woven biodegradable net made to our unique specification under licence in Sri Lanka. The hand woven net increases surface cover and surface roughness…

Read more
Living-Root-Wad-Revetment
News

10th Anniversary River Dulais Project

Tenth Anniversary of Salix’s Project on The River Dulais, Rhosmaen, Llandeilo. Salix’s River Dulais project demonstrating the use of large woody debris (LWD) is now ten years old and we…

Read more
Rock rolls arrive in bundles with certified lifting straps
News

Rock’n’Roll!

Rock Rolls are a robust, flexible and permanent revetment for use around reservoirs, shorelines, lake edges, streams and river banks. They are environmentally sensitive, cost-effective revetments that are suitable alternatives…

Read more
Solution

Wilderness Lake

The Wilderness Lake is an important coarse fishery and recreational resource on the edge of Porthcawl in South Wales. It also functions as a flood storage area for the surrounding…

Read more
Longham Lakes
Solution

Longham Lakes

Working for Bournemouth & West Hants Water, Salix were appointed as Main Contractor to undertake 2km of bioengineering works to stabilise the shoreline of a new reservoir.

Read more
Completed site with new wetland planting
News

Habitat Creation Scores In Independent Report

Salix successfully tendered for a project to form a backwater and island in a field adjacent to the Grand Union Canal. The aim was to restore a wetland area on…

Read more
Solution

River Pinn Enhancement

Salix designed and constructed a stream enhancement project at a gas pipeline river crossing as ecological mitigation to a degraded reach of stream as part of a major pipeline project.

Read more
Rock rolls provide an instant flexible solution to many scour problems
Product

Pre-filled Rock Roll

Rock Rolls are a robust and permanent revetment for use around reservoirs, shorelines, lake edges, streams and river banks. They are cost-effective revetments that are suitable alternatives to rock rip…

Read more
Triton gabion
Product

Triton

Tensar® Triton® Coastal and Waterway systems are a durable, non-corrosive solution for many coastal and inland waterway erosion issues such as bridge and shoreline scour protection.

Read more
Pre-filled Rock Roll Mattress in stock ready for delivery
Product

Pre-filled Rock Mattresses

Rock Mattresses are a robust and permanent revetment for use around reservoirs, shorelines, lake edges, streams and river banks. They are cost-effective revetments that are suitable alternatives to rock rip…

Read more
Locke Park Lake
Solution

Locke Park Lake

Locke Park Lake had become silted to the point that it could no longer be safely used for boating. Salix were employed as main contractor to de-silt the lake…

Read more
Dredging in front of Lichfield Cathedral
Solution

Beacon Park

Salix were employed by main contractor Casey to undertake the restoration work to Beacon Pool for Lichfield Council on this Heritage lottery funded project.

Read more
Solution

Kelham Island Goit

Salix were contracted by Mansell construction to dredge the contaminated Goit forming Kelham Island and working closely with ecologists ECUS to create marginal habitat.

Read more
A two hectare area of open water had extensive embankment erosion due to massive populations of Canada Geese
Solution

Upper Lake, Perton

A two hectare area of open water had extensive embankment erosion due to massive populations of Canada Geese which created public health & safety issues.

Read more
Solution

Grand Union Canal

The project aim was to restore a wetland area on the banks of the Grand Union Canal for the benefit of wildlife and the fishery. The scheme design ensured that…

Read more
Solution

River Tywi

Salix were awarded a design and build contract to prevent further erosion of a section of the riverbank and reinstate a scour hole threatening a high pressure gas pipeline on…

Read more
Live Willow Revetments
Product

Live Willow Revetments

Living willow has been used as a method of controlling riverbank erosion for centuries. Salix employ traditional techniques and more modern approaches based upon the site specific erosion process.

Read more
Brushwood Faggots
Product

Brushwood faggot/fascine

Salix produce a range of brushwood faggots (fascines) for use in rivers, canals and lakes. We use brushwood from sustainable sources and can supply various timber types including Ash, Hazel…

Read more