HydraCX
A Down To Earth Green Roof Solution
Creating a green roof on a 43° pitch using our HydraCX and native wildflower seed
Silent Valley Erosion Control
HydraCX™ was applied to 125,000m2 of poor, erosion prone soil at a large landfill site in Ebbw Vale, South Wales. HydraCX is a hydraulically applied erosion control product that protects slopes against soil and seed loss from heavy rain and wind from day one of application.
Green Swales on Roadside
Soft engineered ‘Green Swale Grass Channel’ attenuates road run-off water, filters suspended solids, and traps hydro carbons and heavy metals, significantly improving water quality.
Bionet C125BN
Silent Valley Landfill
HydraCX has been applied to a landfill site in Ebbw Vale. The liner system isolates the landfill contents from the environment therefore protecting the soil and ground water from pollution.
Salix installs new green channel to reduce A11 pollution
Salix has installed a revolutionary green drainage channel along an 18km stretch of the A11 in Norfolk, between Fiveways and Thetford.
M25 Road Widening
Salix were tasked with greening up a 45 degree slope consisting of 6F2 fill. The initial design was a covering of 150mm of topsoil over an area of about 8,000m2 using a geocell product attached to the surface of the slope to contain the soil and prevent it from slipping.
Kingsbury Tamworth Rail Line
Salix applied HydraCX in September 2009 to slopes consisting of 6I/J fill material with no imported topsoil covering the surface. The project was monitored each year to see how the vegetation established.
Bionet C125BN
Bionet biodegradable erosion control blankets are designed to provide immediate erosion protection and vegetation establishment assistance, then degrade after the root and stem systems of the vegetation are mature enough to permanently stabilise the underlying soil.
Chipping Campden Rail
HydraCX was sprayed onto 5,500m2 of re graded rail embankments to prevent erosion and establish vegetation rapidly without importing expensive topsoil. HydraCX also replaces erosion control geotextiles.
Pewsey Rail Embankment
A rail embankment had slipped and was reinstated with soil nails providing geotechnical stability. Birse created working platforms with imported stone and then used a soil cell system to retain about 150mm depth of soil on slopes up to 43 degrees.
Alix in Wonderland
Over 560m of perched channel in Soham, Cambs was leaking and needed repair. The reach was populated by water vole so a sensitive approach was required in order to create a new habitat as soon as possible.
Dan Y Lan Landfill Slip
The finished slope was 36 degrees, 40 metres in height and 60m wide. 250mm depth of topsoil was required, rather than the nominal 50-75mm, as cover for marginally contaminated on site fill material.
Waverley Colliery Reclamation
A large drainage channel designed to take flows of up to 3m/sec was created to take runoff water from a 741 acre site at Waverley, one of Europe’s biggest collieries.