Eight years on and vegetative erosion control is a massive success on the River Cleddau as an alternative to blockstone.
The advantages of Salix Bioengineering Solutions V Blockstone on two Welsh Rivers

Higher energy rivers can often be stabilised using bioengineering techniques. Salix have unparalleled experience in the design and implementation of these systems.
Traditional engineering solutions have called upon hard revetments such as sheet piling, blockstone or gabion baskets, all of which can have a detrimental impact on river and riparian habitat.
Eight years on and vegetative erosion control is a massive success on the River Cleddau as an alternative to blockstone.
Rock Rolls and pre-planted Coir Rolls & Pallets were used to prevent erosion whilst creating a lovely habitat in Sheffield City centre where a culverted stream had been flash flooding
VMax C350 & Eronet are used on this hydro project to protect the inlet channel and surrounding soils from erosion, working with nature for natural solutions
Contractors, Consultants and Researchers are praising our Rock Rolls and Rock Mattresses for their proven ability to offer sustainable cost effective solutions to more traditional hard engineering such as concrete, rip rap, gabions and blockstone.
Bridging the ecological and engineering gap with our effective bio-engineering solutions
Our Technical Director, David Holland, has been in the most recent edition of CIWEM’sThe Environment Magazine talking about the value of our 3D reinforced turf mats in erosion control.
Tensar VMax P550 is designed for use as erosion control on steep slopes, high-flow channels, spillways, and shorelines.
With funding from the Welsh Government’s Nature Fund, we supported Rhondda Cynon Taf Council in taking steps to naturalise one of the concrete channels which brings water down from the mountains at Cwmparc,
The River Washford runs through the village of Roadwater near Minehead, Somerset. The catchment creates a flashy river which floods parts of the village in large flood events.
Tenth Anniversary of Salix’s Project on The River Dulais, Rhosmaen, Llandeilo.
Salix’s River Dulais project demonstrating the use of large woody debris (LWD) is now ten years old and we are delighted to announce that this ground breaking project has been included in the River Restoration Centre (RRC) Manual of Techniques.
Salix have extensive experience of spillway protection offering advice to engineers involved in this area of expertise.
Our VMax range of Composite Turf Reinforcement Mats (CTRMs) including VMax C350,
The saying “a picture paints a thousand words” could not be more accurately applied than to a current Salix erosion control solution at the University of Birmingham.
Client – Environment Agency
Pilot scheme for catchment restoration of the River Ecclesbourne, that forms part of the Water Framework Directive aim to return rivers to good ecological status.