We invited Salix to re-landscape the watercourse through a design and build project. The works to the watercourse were completed within two weeks of starting on site and, despite a number of prolonged heavy rain events both during and after the works, the pre-established coir rolls and pallets all began putting on new growth within a matter of days providing the watercourse with instant channel vegetation and protection to the toe of the banks. The VMax reinforcement used to stabilise the slopes has also prevented any erosion to the sandy soil beneath and has allowed the rapid establishment of grass which wouldn’t have otherwise been possible.