Following a storm event in February 2022, a 20-metre section of flood wall in the Derbyshire town of Matlock collapsed.
Jackson Civil Engineering,
Following a storm event in February 2022, a 20-metre section of flood wall in the Derbyshire town of Matlock collapsed.
Jackson Civil Engineering,
Salix enabled the restoration of wetlands and chalk stream habitat whilst bypassing a weir which was a listed heritage feature
Salix were commissioned to restore part of the river Mimram whilst protecting the local population of water voles and increasing the biodiversity
The Hoveton Wetlands Restoration project aims to deliver the restoration of Hoveton Great Broad (HGB) and Hudson’s Bay. Salix were appointed by Natural England to complete a major desilting and dredging project
Salix’s Ready-filled Rock Mattresses provided a solution to flood protection works needed on the River Exe. This quick and cheap approach provided a stable, natural embankment on the high energy intertidal river.
Salix were brought in to help with a sensitive erosion problem on a reservoir shoreline in North London. Ecologically sensitive solutions were used which will create habitats and improve amenity value.
Constant flooding and erosion had been causing some serious problems for Merthyr Tydfil Council who manage an old reclaimed tip site, close to the village of Bedlinog in the Taff Bargoed Valley.
East Tullos Burn project transformed a waterway from a straight, hard-engineered channel, into a natural stream, functional floodplain and wetland habitat.
Salix has helped the Norfolk Rivers Trust to improve wildlife habitats on the chalk River Babingley, Hillington Estate near Flitcham, and River Nar at Pentney, near Kings Lynn.
The £21.7 million flood defence scheme involved works on 16 individual reaches of the river and it reduced the risk of tidal flooding to 488 homes and 94 commercial properties in Sandwich. Client – Jackson Civil Engineering working on behalf of the Environment Agency.
Salix were awarded the contract and began works to carry out 300 metres of riverbank protection to protect this existing exposed high pressure gas pipe in March 2013.
1 km of new and existing channel was enhanced using bioengineering techniques as part of a flood protection project in the centre of historic Pembroke in West Wales.
Salix worked with consulting geotechnical engineers to provide design and build proposals to stabilise over 800 metres of steep riverbank composed of highly erodible colliery shale.
Salix advised engineers Halcrow on bioengineering methods to stabilise a regraded slope as part of an inter-tidal river enhancement project. The existing vertical retaining wall provided no habitat value.
The River Roding is an inter-tidal river and these works were undertaken 100m upstream of the Barking Barrier, Greater London. The works were part of an Environment Agency environmental enhancement project with both flood defence and nature conservation in mind.
A large drainage channel designed to take flows of up to 3m/sec was created to take runoff water from a 741 acre site at Waverley, one of Europe’s biggest collieries.
Salix successfully tendered for a pilot project to improve marginal vegetation along the River Wandle. The project formed part of a wider scheme to reintroduce water vole to the river.
An important water vole site at Soham Lode required emergency re-lining of the perched section of the reach (approximately 600m) Following the emergency works, Salix were awarded a Design & Build contract on a competitive bid process…
Salix were awarded a design and build contract to prevent further erosion of a section of the riverbank and reinstate a scour hole threatening a high pressure gas pipeline on the River Tywi.
The River Teme is a sensitive SSSI and SAC river and over 150 metres of severe bank erosion was threatening a National Grid pipeline.